您好!欢迎光临德州市昊卓新型材料有限公司,我们竭诚为您服务!

德州市昊卓新型材料有限公司

防渗设计、技术咨询、施工服务复合型水泥毯生产商

产品咨询热线:

18654757623
当前位置: 首页 > Product Display > Drainage Sheet >
Plastic drainage board
300+ 条评价
一年内 58000+ 平方米成交
价格
¥4.99
100平方米起批
宽幅
规格型号
产品特点
适用范围
材质
常用工程
品牌
产地

Plastic drainage board商品描述

Plastic drainage board(图1)

Plastic drainage board(图2)

Plastic drainage board(图3)


Laying method


1. Clean up the garbage and cement leveling on the laying site to make sure there are no obvious bumps or depressions. 

The outdoor garage roof and rooftop garden need to have a 2-5% slope.


2. It can concentrate the water discharged from the drainage board and discharge it to nearby sewage pipes or urban sewers.


3. The basement floor is designed to prevent water seepage. An elevated floor is built on top of the foundation, which means

a layer of drainage board is made before the floor is made. The circular protruding platform is facing downwards, and blind ditches

are left around it to prevent groundwater from coming up. Water seepage naturally flows into the surrounding blind ditches through

the space of the drainage board, and then into the collection pit through the blind ditches.


4. Waterproofing of basement walls can be achieved by laying drainage boards on the main wall of the building, with circular

protrusions facing the main wall. Build another layer of single wall outside the drainage board or use steel wire mesh powder cement

to protect the drainage board, so that the space of the permeable board outside the wall flows straight down into the blind ditch to

the collection pit.


5. When laying drainage boards in any area, attention must be paid to not allowing soil, cement, yellow sand and other garbage

to enter the front space of the drainage board, ensuring that the space of the drainage board is unobstructed.


6. When laying drainage boards, protective measures should be taken as much as possible. When laying drainage boards on

thesurface or in outdoor garages, backfilling work should be done as soon as possible to prevent strong winds from affecting the

quality of the laying. The basement and interior wall waterproofing should be protected as soon as possible to prevent the drainage

board from being damaged by people or objects.


7. Backfill soil is cohesive soil, and it is ideal to lay 3-5 cm of yellow sand on top of the geotextile to facilitate water filtration;If

backfill soil is a nutrient rich or lightweight soil, there is no need to lay another layer of yellow sand, as this soil is already loose and

easily filters water.


8. When laying the drainage board, it can be overlapped with 1-2 support points on the right side, or two bottom plates can

be aligned and overlapped with geotextile on top. As long as no soil enters the drainage channel of the drainage board, the drainage

can be kept smooth.


上一篇: Previous:HDPE drainage board

下一篇:Next:Green drainage board