Plastic drainage board商品描述
Laying method
1. Clean up the garbage and cement leveling on the laying site to make sure there are no obvious bumps or depressions.
The outdoor garage roof and rooftop garden need to have a 2-5% slope.
2. It can concentrate the water discharged from the drainage board and discharge it to nearby sewage pipes or urban sewers.
3. The basement floor is designed to prevent water seepage. An elevated floor is built on top of the foundation, which means
a layer of drainage board is made before the floor is made. The circular protruding platform is facing downwards, and blind ditches
are left around it to prevent groundwater from coming up. Water seepage naturally flows into the surrounding blind ditches through
the space of the drainage board, and then into the collection pit through the blind ditches.
4. Waterproofing of basement walls can be achieved by laying drainage boards on the main wall of the building, with circular
protrusions facing the main wall. Build another layer of single wall outside the drainage board or use steel wire mesh powder cement
to protect the drainage board, so that the space of the permeable board outside the wall flows straight down into the blind ditch to
the collection pit.
5. When laying drainage boards in any area, attention must be paid to not allowing soil, cement, yellow sand and other garbage
to enter the front space of the drainage board, ensuring that the space of the drainage board is unobstructed.
6. When laying drainage boards, protective measures should be taken as much as possible. When laying drainage boards on
thesurface or in outdoor garages, backfilling work should be done as soon as possible to prevent strong winds from affecting the
quality of the laying. The basement and interior wall waterproofing should be protected as soon as possible to prevent the drainage
board from being damaged by people or objects.
7. Backfill soil is cohesive soil, and it is ideal to lay 3-5 cm of yellow sand on top of the geotextile to facilitate water filtration;If
backfill soil is a nutrient rich or lightweight soil, there is no need to lay another layer of yellow sand, as this soil is already loose and
easily filters water.
8. When laying the drainage board, it can be overlapped with 1-2 support points on the right side, or two bottom plates can
be aligned and overlapped with geotextile on top. As long as no soil enters the drainage channel of the drainage board, the drainage
can be kept smooth.
上一篇: Previous:HDPE drainage board
下一篇:Next:Green drainage board
- 11-26The function and construction method of geomembrane
- 11-26Characteristics and functions of geotextile
- 11-26The difference between long filament geotextile and short filament geotextile
- 11-26The role of impermeable membrane in aquaculture
- 11-26What are the advantages of using cement blankets for slope protection
- 11-26The difference between geomembrane and composite geomembrane
- 1What is waterproof geotextile
- 2Will geomembranes pollute the environment?
- 3Classification of Geotextiles
- 4The function and construction method of geomembrane
- 5Characteristics and functions of geotextile
- 6Installation of garage roof drainage board
- 7Application of Grass proof Cloth
- 8The difference between geomembrane and composite geomembrane
- 9Key points of geomembrane welding
- 10The use of composite geomembrane