您好!欢迎光临德州市昊卓新型材料有限公司,我们竭诚为您服务!

德州市昊卓新型材料有限公司

防渗设计、技术咨询、施工服务复合型水泥毯生产商

产品咨询热线:

18654757623
当前位置: 首页 > Product Display > Concrete Cloth >
Cement blanket for slope protection of water channels and ditches
300+ 条评价
一年内 58000+ 平方米成交
价格
¥10
100平方米起批
宽幅
规格型号
产品特点
适用范围
材质
常用工程
品牌
产地

Cement blanket for slope protection of water channels and ditches商品描述

Cement blanket for slope protection of water channels and ditches(图1)

Cement blanket for slope protection of water channels and ditches(图2)

Cement blanket for slope protection of water channels and ditches(图3)


Cement blanket for slope protection of water channels and ditches(图4)

Cement blanket for slope protection of water channels and ditches(图5)

Cement blanket for slope protection of water channels and ditches(图6)

Cement blanket for slope protection of water channels and ditches(图7)

Cement blanket for slope protection of water channels and ditches(图8)

     

Product features: This flexible concrete composite pad can be made into standard roll materials or customized in bulk according to

different widths. It has anti-corrosion, anti-seepage, antifreeze, crack prevention, slope protection reinforcement, low cost, energy

saving, etc. It can be widely used in different fields, such as slope protection, water channels, ponds, artificial lakes, etc. It has good

comprehensive performance and is easy to use.


Compared with existing technologies, flexible concrete composite pads can quickly solidify with reinforced layers, flexible skeleton

layers, and concrete filling layers after the water absorbing protective layer absorbs moisture. They have the characteristics of short

setting period, high strength, fast and convenient construction, and can replace traditional concrete construction processes. This product

only requires watering to form a durable concrete layer with the desired shape and hardness. Using different cement formulas, it can

form concrete like structures that are anti-seepage, crack resistant, heat-insulating, anti erosion, fire-resistant, anti-corrosion, and durable.


 


Laying construction


1. The preparation work first requires planning, measurement, and a certain slope to ensure that water flows smoothly from the upper end 

to the lower end; The second step is to clean and level the construction site, set up construction lines according to the design drawings, and 

remeasure the drainage slope.


2. Construction lines shall be set up according to the design requirements for excavation. Both sides of the ditch shall be leveled, and there

shall be no loose soil or voids on the slope inside the ditch. It is required to compact the water damaged areas, remove all debris and gravel

from the slope, and if necessary, use Sanqi lime soil for compaction or grouting reinforcement before sealing. The stability of the treated

areas should be good!


3. The laying materials can be laid vertically and horizontally. Please make sure to level the substrate, otherwise it will affect the appearance!


4. Seam treatment


a. Dig a 10cm wide horizontal pit with a depth of the first generation of cement blankets at the overlapping point of adjacent cement blankets,

and place and flatten the joint of the cement blankets at the overlapping point.


b. Press the upper cement blanket onto the lower cement blanket in the direction of the water flow, with a minimum overlap of 10 centimeters.


c. Apply sealant evenly at the joint. (Or evenly sprinkle cement powder)


d. Secure the two cement blankets with stainless steel screws.


e. Groove edge treatment, use rivets to fix the material edge on the groove edge, and also use rivets to fix the overlapping area. After fixing,

cover the edge with the diagram


f. After the preliminary work is completed, water evenly and thoroughly. After 12 hours, water evenly again for maintenance, with a cycle of three days